Garraf Marina
284 moorings for lengths up to 15 meters
AISTER was the company selected in 2007 to carry out a repair project for concrete pontoons. The works consisted of a first phase in which the fixed alveolar plates that were damaged and the removal of all existing installations (light and water wiring, service pedestals and auxiliary berthing elements) and a second part in which AISTER manufacture two new port levers with fixed aluminum pontoons and the installation of own service pedestals to illuminate and give light and water without interfering in the normal activity of the port.
The club also expanded the number of floating aluminum pontoons by getting 108 new seats to dock ships of different capacities. These pontoons also have service pedestals that provide water, electricity and lighting.
3